Passenger EV Battery Packs
Complete EV battery packs (PACK), declared under UN3480, requiring UN38.3 + DG packaging certificate, shipped as FCL DG.
Traction battery international shipping refers to the specialized logistics service that ships lithium traction batteries — EV battery packs, modules and cells — to global markets safely and compliantly under UN3480/UN3481 dangerous goods rules, using FCL DG space.
HUIN International Logistics has focused on new energy live-equipment logistics for 15 years, holds NVOCC/FMC/IMDG qualifications, with all staff IMDG-certified, DG space contracted with 6 carriers, and provides one-stop services including UN38.3, DG packaging certificates, transport appraisals and SOC shipper-owned-container solutions.
From cells to complete vehicle battery packs, covering every EV battery form. Not sure about the UN number or declaration route? Send your cargo details and get a free classification assessment.
Traction batteries are DG Class 9. Missing documents mean rejection by carriers, refusal by air freight, or detention at destination customs — this is the hard threshold for shipping live-equipment products.
| Document | Applicable Cargo | Processing Time | Validity | HUIN Agent |
|---|---|---|---|---|
| UN38.3 Test Report | All cells/batteries inside the BESS container (cell level) | 7–15 working days | Long-term (per model) | Partner Laboratory |
| DG Packaging Certificate (packaging use appraisal result) | Battery packs / modules / cells (UN3480) | 3-5 working days | Per shipment | Full agency |
| MSDS Safety Data Sheet | All traction battery cargo | 1-3 working days | Long-term (per version) | EN & CN bilingual |
| Maritime / Air Transport Appraisal | All traction battery cargo | 2-4 working days | Per shipment | Full agency |
| Battery Discharge Certificate (SOC≤30%) | Cells / modules / battery packs (air or carrier requirement) | With factory test | Per shipment | Template support |
FCL DG, special containers, air CAO and Ro-Ro each have their own boundaries — choose the optimal lane by cargo type, weight and transit time.
| Shipping Mode | Applicable Cargo | Est. Transit Time | Cost | Core Advantages | Limitations |
|---|---|---|---|---|---|
| FCL DG
20/40ft DG container |
Batch cargo of packs / modules / cells | China → Europe 30-40 days | ★★☆★★ | Low batch cost, stable carrier DG space | Requires DG packaging certificate + DG booking, tight space |
| Special Container
FR flat rack / secured |
Oversized bus / truck battery packs | Same as FCL 30-40 days | ★★★☆☆ | Fits overweight oversized units | Higher cost, advance booking needed |
| Air CAO
Cargo aircraft only |
Module / cell samples, urgent items (≤ a few kg) | 3-7 days | ★★★★★ | Fastest, ideal for samples & after-sales parts | Module level only, battery packs prohibited |
| Ro-Ro
EV complete vehicles |
Complete vehicles with batteries (shipped on car) | 30-45 days | ★★★☆☆ | Built for complete vehicle export | Requires power-off + SOC limits |
From inquiry assessment to final delivery — documents, DG booking, container loading and securing, and DG declaration are all handled for you.
Submit battery spec sheet / capacity / weight / quantity; get a free UN number (3480/3481) and declaration route determination.
UN38.3 / DG packaging certificate / MSDS / transport appraisal — fully handled by HUIN, in parallel with booking.
Apply for carrier DG space, confirm container type, packaging certificate number and DG declaration requirements, lock in space.
Maritime DG declaration, customs documentation; bill of lading issued after release.
Maritime DG declaration, customs documentation; bill of lading issued after release.
Destination clearance, duty payment (DDP optional), delivery to battery / OEM plant warehouse.
Every shipment is verifiable — transparent cargo specs, routes, container types, lead times, key challenges, and results.
The core of traction battery shipping is short-circuit prevention, state-of-charge control and UN packaging compliance — the following standards are based on IMDG Code and IATA DGR.
Cartons / cases must pass UN 4G and other certifications; inner batteries and outer boxes bear UN markings, with specs matching the cargo type.
Discharge batteries to SOC≤30% before shipment and issue a discharge certificate to reduce thermal runaway risk (carrier hard requirement).
Insulating tape / end caps on terminals, isolation between cells to prevent accidental contact between positive and negative poles.
Large battery packs wrapped in flame-retardant material, kept away from heat sources in the hold, with an emergency response plan in place.
Class 9 diamond label, UN number, urgent / orientation marks; photos taken after loading for the record.
HUIN provides on-site supervision and photo documentation of the lifting process, fully traceable and satisfying carrier and destination inspections.
Qualifications, UN numbers, discharging, air restrictions — 8 high-frequency questions answered at once.
HUIN's dedicated consultant will reply to you as soon as possible after receiving your message.